World Class Productivity Inc.
WCP's PM Improvement System / Logic Diagram

Logic diagram

WCP's PM Improvement System

A process for defining Project Improvement Priorities, integrating them into PM workflow, and operationalizing them through management systems.

Source: Obsidian note “WCP's PM Improvement System (Draft)”. Tight labels and 1-3 word descriptions are added to make the system readable as a diagram; detailed questions are preserved below.

Visual flowchart

From improvement priorities to operating model

The main logic is sequential, with optional discovery, workflow loops, management branches, and hiring-trigger logic.

01 / PIPDefine Priorities

Future state Vision Shift
Current / target State Scale
Tentative Root Cause
Tentative Diagnostic
Priority choice 30-90 Day Techniques

02 / PM workflowDesign Integration

Example standard WGLL
Workflow loop Process Integration
Input
Work
Output
Use
Schedule fit Time Blocks
Tool fit Where Work Happens

03 / managementOperationalize

Management gateway Measure / Manage
Talent system Trust / Verify
People system Scorecards / L&D
Capacity branch Capacity Planning
Model work Workload Model
Capacity / demand Hiring Triggers

04 / changeEnable Change

Proof path SWAT Team
Air cover Exec Sponsor
Adoption path Peer Support
Scale condition Training / Docs
Future state PM Operating System
Stage arrows Move left to right through the operating system.
Diamonds Decision or branch points that shape the next workstream.
Detailed prompts Use the sections below for the full facilitation questions.

Workflow integration loop

Inputs Required What inputs are required to do these well?
Activity Changes Net new activities or updates to current activities.
Outputs Expected What outputs do we expect?
Downstream Use How will outputs support future decisions and execution quality?
Upstream / Downstream Loop questions for upstream inputs and downstream usefulness/value.

Detailed prompts

Questions behind each node

Use these as the facilitation prompts, workshop agenda, or working checklist beneath the diagram.

Define Project Improvement Priorities
PIP Priorities
  • Describe their vision for how they'd like to see the PM culture or project delivery shift by a year from now + 1quarter/1 month.
  • Optional: Have a numerical and/or visual scale that they can peg current and target state on.
  • [ ] (Tenative) Exercise: Root cause analysis.
  • [ ] (Tenative) Diagnostic.
  • Which PM principles and techniques does LiftWerx most want PMs using consistently in the next 30-90 days?
PM Workflow Integration
WGLL Process Schedule Tools

Good standard

  • What does good look like? (not a theoretical question; do we literally have documented examples of WGLL?)

Team process

  • How will these be integrated into the team’s process?
  • What inputs are required to do these well? What changes (whether net new activities or updates to how activities are done today) are required to secure those inputs in the right way at the right time?
  • What outputs do we expect? How will these outputs get used downstream to support future decision-making and quality of project execution?
  • How and when will these upstream and downstream activities (whether net new or updates) be integrated into the team's workflows?
  • Loop these questions to determine other inputs required for upstream activities, or other activities required for downstream usefulness/value.
  • What communication, documentation, and training is required to operationalize these workflow changes?

Tooling

  • How will these be integrated into the team's tooling?
  • Automation vs counting waldos:
    • Where will these activities get done in the future?
    • Where will they get done today?
Time and Priority Fit
Activity Role Tradeoff

Per activity

  • How much time will it take the team to implement these workflow activity/behaviour changes? (including prep time, implementation time, and post-activity todos)
  • At the beginning?
  • Once they're more experienced/familiar with them?
  • At what point do we want people blocking this time?
  • What kind of flexibility does the team have for when the activity gets completed?
  • What kind of situations will warrant vs not warrant bumping these calendar blocks?

Per role

  • How frequently do these activities occur in a given period? Will this change over time?
  • What's total time commitment in a given period (frequency + length)?

Prioritization

  • Given the expected net new time/week to do a good job of this, how much time will we want to take off the team's plate to be able to feasibly get this done?
  • What are the lowest priority items the team's working on that could be deprioritized that cumulatively are => the time 'adds' (we may prefer to take more off the teams plate than we add on if the team's already struggling to complete their core responsibilities at the desired quality)
Talent Development Integration
Verify Manage Develop
  • Trust but verify (consider using random sampling).
  • How and when will the activities be measured (eg reporting / 1:1s + manual spot checks) and managed (coaching + mentorship; dashboards; performance reviews)?
  • Do we want to formally integrate these behaviours into our hiring scorecards and performance review frameworks?
  • [ ] (This could be it's own set of intensive branches)
  • [ ] Integrate into learning and development plan and career pathing.
Capacity Planning
Project Role Resourcing
  • What's the all-in time requirement to complete all the expected responsibilities for a single project? Map the...
    • Status quo requirement.
    • Target state requirement - short term; accounting for ramp time.
    • Target state requirement - longer term.
  • How smooth/lumpy is the per project time requirement distribution?
    • If the time distribution is lumpy, what options might we want to consider to stagger project assignments (and, other work/responsibilities as needed) in order to proactively plan in destructive interference (where peak business in one project overlaps with low-intensity periods in other areas), and avoid constructive interference (where multiple peak busy periods occur/stack at the same time)
    • Given the staggering / sequencing plan, how many projects do we want team members taking on in a given period?
  • What's the all-in time requirement to complete all the responsibilities for the given role? Map out...
    • Weekly, monthly, quarterly (to account for the different operating rhythms that each will have - e.g. monthly 1:1s, team training, quarterly company retreats, etc)
    • For status quo, target state (short term), target state (longer term)
  • Assess time requirements overall and per period relative to time available, and make adjustments as necessary to:
    • Scope of responsibilities.
    • Volume of activities within each responsibility.
    • Quality/consistency expectations.
    • Resourcing.
Hiring Trigger Logic
Capacity Demand Lead time Plan

Team Capacity Model

  • Given a PM's current project/work load (relative to max workload), how much capacity do we have as a team to take on additional work?
  • What's the typical employee attrition rate, and how do projections of available team capacity change when this is taken into account? (multiply team capacity by average monthly attrition rate)
  • Demand Projection: Given current vs projected demand (e.g. use sales targets/projections), how soon might we run out of capacity to meet market demand?
  • What's the capacity of a partially ramped PM? A fully ramped PM?

Hiring and Ramp Considerations

  • What's typical hiring time end to end from open req to offer extended to first day on the job?
  • What's typical ramp time?
  • Are there strong preferences between hiring individuals vs cohorts?
  • Internal vs External Hires:
    • How do internal promotions change the equation (e.g. shorter hiring and ramp process; reduces capacity on another time)
    • What's the typical ratio of internal promotions vs external hires?

Define and create

  • Defining Hiring Triggers: Based on hiring and ramp lead times, what's the minimum number of months in advance of a capacity shortfall that we'd want to open a hiring req?
  • Create the Hiring Plan: Based on projected capacity shortfalls, how many hiring reqs will we want to open, and by when?
Change Enablement
SWAT Sponsor Support
  • Coby process + starting with SWAT team to prove it out + securing executive sponsorship + securing peer/department support.
  • ... (more to come; didn't have time to finish)